Completed so far (~60-70%) are:
- frame mounted to engine, along with center and side stands
- U-joint installed, bearings replaced and greased and swing arm mounted
- rear drive attached, with shocks
- headstock bearings greased and triple trees attached
- forks serviced and attached
- all electrical (new harness) laid out and connected, including coils, rec/reg, fuse box, relays
No comments:
Post a Comment